Buildings
Management and Supervision - Buildings

FLUVIÁRIO DE MORA (River Aquarium)

INFORMATION

CLIENT:
Promontório

SERVICES:
Project Design of Water Supply, Fire Fighting and Irrigation Networks
Sewerage and Drainage Networks
Technical Assistance during Construction

BEGINING:
2004

CONCLUSION:
2006

LOCATION:
Mora, Portugal

DESCRIPTION

A complex to display natural water and land habitats, with content representative of the Alentejo fauna and flora, where the public can watch animals interact with the environment they live in. Cenor completed the following studies: Internal water network for fire water; borehole to capture water (22m3/hour) to feed the reservoir (130m3) inside the building and to replenish evaporation losses in the reservoir (A= 90m2) that feeds the watering area (Q=1,25liters/sec). The reservoir is equipped with all of the necessary hydraulic safety devices (overflow spillway and bottom drain). Drainage system for domestic drainage and rainwater. Otter Aquarium Water and Sewage Network.