INFORMATION
CLIENT:
REFER
SERVICES:
Consultancy, Supervision e Coordination
Administrative Management
Control of Costs
Control of Planning
Control of Quality
Control of Safety
Control of Environment
BEGINING:
2008
CONCLUSION:
2009
LOCATION:
Barreiro, Pinhal Novo, Portugal
DESCRIPTION
The Electrification and Modernization Works for the railway Stations, at Barreiro/Pinhal Novo Section, comprised the:
- Phased railway operation, in order to allow the execution of several works: track platforms, drainage, as well as all the necessary interventions concerning the railway line and Catenary;
- Construction of 7 Stations/Way Stations (Barreiro Mar, Barreiro A, Lavradio, Baixa da Banheira, Alhos Vedros, Moita e Penteado) which included several engineering specialties (Structures, Architecture, Electrical and Electromechanical installations, Signaling and Safety, streets and sidewalks, and streets lighting);
- Construction of a Pedestrian Overpass;
- Modification of the Barreiro Mar and Lavradio’ Stations railway layouts;
- Partial renovation of the railway superstructure and installation of the Catenary and RCT+TP (Propulsion Power Return + Protective Ground) (track electrification);
- Design: Ferbritas e Viyella e Carvalho;
- Contractor: Construtora Abrantina and Lena Construções Consortium.