Management and Supervision - Infrastructures

BEIRA BAIXA RAILWAY LINE. MODERNIZATION OF THE VALE DE PRAZERES/COVILHÃ SUBSECTION

INFORMATION

CLIENT:
REFER

SERVICES:
Consultancy
Supervision and Coordination
Administrative Management
Control of Costs, Control of Planning
Control of Quality
Control of Safety
Control of Environment

BEGINING:
2009

CONCLUSION:
In Progress

LOCATION:
Covilhã, Portugal

DESCRIPTION

  • Partial renovation of the track superstructure between Vale de Prazeres and Covilhã, replacing the track equipment in the Fatela/Penamacor tunnel and on the Enxames, Carneiros, Alvega and Meimôa bridges and occasional downgrades of the electrification gauges;
  • Work carried out at Fundão, Tortosendo and Covilhã and Vale Prazeres stations;
  • Reinforcement of slopes and execution of drainage in several places along the route;
  • Construction of 6 structures: 1 PS, 2 PIs, 2 PSPs and 1 PA and their corresponding rallies to eliminate PNs in the urban area of Fundão;
  • Installation of overhead contact line and RCT + TP.