Hydraulics - Urban Hydraulic

WASTE WATER SYSTEMS OF THE GUADIANA BASIN

INFORMATION

CLIENT:
Águas do Centro Alentejo

SERVICES:
Preliminary Study
Final Design
Technical Assistance

BEGINING:
2004

CONCLUSION:
2006

LOCATION:
Redondo, Évora, Portugal

 

DESCRIPTION

CENOR developed in association with Sisáqua the projects of the sewage pumping stations and interceptors of Montoito and Redondo.

The project includes the following infrastructures:

Montoito

  • 5 Pumping Stations:
    • Q = 6 to 40l/s e H = 8 to 11m H2O
  • Interceptors:
    • L = 550m and DN = 200 to 400mm

 

Redondo

  • 2 Pumping Stations:
    • Q = 14 and 20l/s e H = 50 m H2O
  • Interceptors:
    • L = 1250m and DN = 200 to 250mm